Copyright © 2024 Guangzhou Tiger Head Energy Co., Ltd.
This project is a 1,197 kWp (peak power) distributed grid-connected photovoltaic power station, specifically customized for industrial factory rooftops. With a total installed capacity of 1.197 MW, it has an estimated annual power generation of approximately 1.07 million kWh (actual output may vary based on local solar irradiation conditions and potential shading on the rooftop).
Centered around the concept of "utilizing idle rooftop resources and reducing costs through self-consumption," the system makes use of unused rooftop space to generate electricity that primarily meets the production energy demands of the enterprise. Surplus electricity is fed into the public grid. The project helps industrial users lower electricity expenses while reducing carbon emissions, supporting both China’s "Dual Carbon" policy and the transition toward green manufacturing.
Statistical analysis |
Data |
Average annual revenue from Solar PV |
About RMB650,000.00(USD90,909.00) |
Total project investment |
About RMB3,600,000.00(USD503,497.00) |
Estimated investment return period |
About 4.5 to 5 years |
This project is a 1,197 kWp (peak power) distributed grid-connected photovoltaic power station, specifically customized for industrial factory rooftops. With a total installed capacity of 1.197 MW, it has an estimated annual power generation of approximately 1.07 million kWh (actual output may vary based on local solar irradiation conditions and potential shading on the rooftop).
Centered around the concept of "utilizing idle rooftop resources and reducing costs through self-consumption," the system makes use of unused rooftop space to generate electricity that primarily meets the production energy demands of the enterprise. Surplus electricity is fed into the public grid. The project helps industrial users lower electricity expenses while reducing carbon emissions, supporting both China’s "Dual Carbon" policy and the transition toward green manufacturing.
Statistical analysis |
Data |
Average annual revenue from Solar PV |
About RMB650,000.00(USD90,909.00) |
Total project investment |
About RMB3,600,000.00(USD503,497.00) |
Estimated investment return period |
About 4.5 to 5 years |